|
|
Tent City - The Tents MastsAssembly of the MastsThe tent master and operations inspector note the exact location of the master anchor. ![]() The parts of the masts are assembled. ![]() Afterwards, the illuminated crowns are mounted, and with the assistance of a crane, hoisted into position, 20 meters high.
|